Around Belle Glade the ground itself has been sinking. University of Florida measurements at the Belle Glade post show the organic muck subsided about 48 inches between 1924 and 1967, with soil depth there down from about nine feet to roughly 37 inches. We ask what sits under a slab before we price removing it.

The city began as Hillsboro, got its post office in 1921 and incorporated in 1928, under the motto “Her Soil Is Her Fortune.” The hurricane of September 16 that year drove Lake Okeechobee over the low dikes; the National Weather Service puts the toll at no fewer than 2,500, most of them farmworkers in the Glades towns. The Herbert Hoover Dike that followed now runs 143 miles, and its rehabilitation was declared substantially complete in January 2023.

The Building Department posts an asbestos form, a Utilities Easement Consent Form, a “Request Electrical Inspection for Release of Power” and an owner-builder affidavit, but no dedicated demolition checklist. A plan review fee is due when the application goes in. Ask the department which of those forms a demolition needs for your parcel.

Sources: City of Belle Glade: history · NWS Miami: the 1928 Okeechobee hurricane · Hurricane Science: Okeechobee 1928 and the dike · DVIDS: Herbert Hoover Dike rehabilitation complete · UF/IFAS: soil subsidence in the Everglades Agricultural Area

Demolition permits in Belle Glade

City of Belle Glade Building Department

The Permitting Documents page posts the Asbestos form, the Utilities Easement Consent Form, Request Electrical Inspection for Release of Power and an owner-builder affidavit. No demolition checklist is published; ask the department what it requires. A plan review fee is due at submittal.

Read the official page

A general summary only, and not legal advice. When Romco takes the job, the application goes in under our name as contractor of record. Palm Beach demolition permit guide

What we quote in Belle Glade

Demolition we quote here

Order of work

From first call to closed permit

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A garden shed and an apartment building go through these steps in the same order.

  1. Call or send the form

    Give the address, what is coming down and anything that must be protected. Photos or a survey help.

  2. Walk the property

    We check the structure, live services, truck access, trees, the seawall or neighbor close by, and any association rules.

  3. Scope and price in writing

    Removal, protection, haul-off and anything that depends on the asbestos survey are listed line by line.

  4. Notices, letters and permit

    The licensed asbestos survey and any health department notice, the utility releases, then the application to the right building office.

  5. Take it down and haul it out

    Work runs in the agreed order. Loads go to Solid Waste Authority–permitted facilities, or the hauler your city requires.

  6. Final inspection and close-out

    The inspector signs off and the permit closes. You keep a graded lot or the shell you asked for.

Questions

Demolition in Belle Glade

Does Belle Glade’s muck soil change how a demolition is priced?

It can. The organic soils around Belle Glade have subsided for about a century, which is why we ask about foundations, fill and slab depth before we price removal. The city publishes no soil rule for demolition, so the answer comes from the building’s records, a site visit and, where it matters, a geotechnical engineer. Send the survey and photos.

What does a demolition cost, and what moves the number?

We do not publish prices, because the number depends on what surrounds the building. The main drivers are structure type and size, asbestos findings, truck access, the permit and utility requirements for the address, any below-grade work, and the haul to SWA-permitted facilities. Local rules move it too: the Town of Palm Beach requires a bond of the demolition cost plus 35%. Send the survey and photos, and we will price it.

Do I need an asbestos survey before demolition?

For commercial buildings, condos and co-ops, yes. The Florida Department of Health in Palm Beach County requires a survey and written notice at least 10 working days before a regulated demolition, even when no asbestos turns up. An isolated house of four or fewer units is usually excluded, though several cities still ask for an asbestos form with the permit. We arrange a licensed survey and coordinate licensed abatement.

How long does a demolition take?

We do not promise durations, because much of the calendar belongs to other parties. The health department’s asbestos notice needs 10 working days, Sunshine 811 needs two full business days, utility release letters arrive when the utilities issue them, and the Town of Palm Beach bars demolition from the Monday before Thanksgiving through March 31. We set out the sequence in writing with the quote, so you can see what drives it.

Other Palm Beach cities: West Palm Beach · Boca Raton · Palm Beach (the Town) · Jupiter · Delray Beach · Boynton Beach · Palm Beach Gardens · Wellington · Lake Worth Beach · Unincorporated Palm Beach County · Riviera Beach and Singer Island · Royal Palm Beach · Greenacres · North Palm Beach · Tequesta · Highland Beach · Manalapan · Juno Beach · Lantana · Ocean Ridge · Palm Springs

Every type, every size, all of Palm Beach County

Tell us the address and the scope. We will put a number on it.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A single wall or a whole building, each quote arrives as a written scope with a price.

Call (561) 273-9189Request a quote