Tequesta, Palm Beach County
Demolition in Tequesta
Septic abandonment in Tequesta goes on Health Department form DH-4015, and the village checklist asks for it whenever an on-site system is retired. Temporary water is arranged through the Village’s own Utilities Department. For a partial demolition, Tequesta wants signed and sealed engineer drawings showing that what remains will stand.
Developer Charles Martyn bought 350 acres on the forks of the Loxahatchee River in 1955 and laid out 600 home sites around the Tequesta Country Club; the village incorporated in 1957. It covers about 1.75 square miles, from the river’s northwest fork east to the ocean on Jupiter Island and north to the Martin County line, which makes it the northernmost town in the county.
The checklist wants the DEP Notice of Demolition or Asbestos Renovation (Form 62-257), the asbestos survey firm’s name and report where one applies, an asbestos notification statement, an extermination certificate, silt fence on the survey, and a pre-demolition inspection. It lists no FPL or gas disconnect letters, so ask the Building Department whether it wants them anyway.
Trees can hold up a clearing job here. Removal needs a written application to the Building Department under Sec. 50-233, and historic, specimen, native or endangered trees go to a hearing before the Planning and Zoning Board, sitting as tree board, and then the Village Council.
Sources: Historical Society of Palm Beach County: Tequesta · Village of Tequesta: tree removal guidelines
Demolition permits in Tequesta
Village of Tequesta Building Department
Demolition Permit Submittal Requirements: application, survey, silt fence, asbestos notification statement, engineer drawings for partial demolition, DEP Form 62-257 with survey details, DH-4015 for septic abandonment, extermination certificate, pre-demolition inspection and temporary water through Village Utilities. Permits file through BSA Online. Confirm with the department.
Read the official pageA general summary only, and not legal advice. When Romco takes the job, the application goes in under our name as contractor of record. Palm Beach demolition permit guide
What we quote in Tequesta
Demolition we quote here
- Interior demolitionStrip-outs inside condos, offices and stores, with the asbestos question settled first.Interior demolition in Palm Beach →
- Selective demolitionOne wing, one floor or one wall removed while the rest of the building stays in use.Selective demolition in Palm Beach →
- Commercial demolitionStores, offices, warehouses and plazas, taken down once the releases are in hand.Commercial demolition in Palm Beach →
- House demolitionSingle-family teardowns, with the sheds, pool and septic tank handled to code.House demolition in Palm Beach →
- Structural demolitionConcrete towers, parking garages and steel frames, taken down in engineered sequence.Structural demolition in Palm Beach →
- Concrete removalSlabs, driveways, patios, walks and footings, broken out after the locates are in.Concrete removal in Palm Beach →
- Pool removalBottom broken out and filled, or the shell, deck and equipment removed entirely.Pool removal in Palm Beach →
- Mobile home demolitionSingle units or several in one park, with approvals and permits in order first.Mobile home demolition in Palm Beach →
- Storm damage demolitionTaking down what a hurricane or tornado left unsafe, once the adjuster has seen it.Storm damage demolition in Palm Beach →
- Site clearingBrush, stumps, buried slabs and old fill cleared once the vegetation permits are in.Site clearing in Palm Beach →
- Asbestos coordinationLicensed survey, health department notice and licensed abatement, in the right order.Asbestos coordination in Palm Beach →
- Accessory structure demolitionSheds, detached garages, cabanas, carports, barns and signs, one or several.Accessory structure demolition in Palm Beach →
- Something else?Every type of demolition is quoted, whatever the size. If your job is missing above, describe it on the phone.Call (561) 273-9189 →
Order of work
From first call to closed permit
Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A garden shed and an apartment building go through these steps in the same order.
Call or send the form
Give the address, what is coming down and anything that must be protected. Photos or a survey help.
Walk the property
We check the structure, live services, truck access, trees, the seawall or neighbor close by, and any association rules.
Scope and price in writing
Removal, protection, haul-off and anything that depends on the asbestos survey are listed line by line.
Notices, letters and permit
The licensed asbestos survey and any health department notice, the utility releases, then the application to the right building office.
Take it down and haul it out
Work runs in the agreed order. Loads go to Solid Waste Authority–permitted facilities, or the hauler your city requires.
Final inspection and close-out
The inspector signs off and the permit closes. You keep a graded lot or the shell you asked for.
Questions
Demolition in Tequesta
Does a partial demolition in Tequesta need an engineer?
Yes, under the Village checklist. For a partial demolition, Tequesta asks for signed and sealed engineer drawings attesting to the structural stability of whatever remains. The engineer is a separate licensed party; we coordinate those drawings with the demolition sequence so the remaining structure stays supported as each piece comes out. Confirm current requirements with the Building Department.
What does a demolition cost, and what moves the number?
We do not publish prices, because the number depends on what surrounds the building. The main drivers are structure type and size, asbestos findings, truck access, the permit and utility requirements for the address, any below-grade work, and the haul to SWA-permitted facilities. Local rules move it too: the Town of Palm Beach requires a bond of the demolition cost plus 35%. Send the survey and photos, and we will price it.
Do I need an asbestos survey before demolition?
For commercial buildings, condos and co-ops, yes. The Florida Department of Health in Palm Beach County requires a survey and written notice at least 10 working days before a regulated demolition, even when no asbestos turns up. An isolated house of four or fewer units is usually excluded, though several cities still ask for an asbestos form with the permit. We arrange a licensed survey and coordinate licensed abatement.
How long does a demolition take?
We do not promise durations, because much of the calendar belongs to other parties. The health department’s asbestos notice needs 10 working days, Sunshine 811 needs two full business days, utility release letters arrive when the utilities issue them, and the Town of Palm Beach bars demolition from the Monday before Thanksgiving through March 31. We set out the sequence in writing with the quote, so you can see what drives it.
Other Palm Beach cities: West Palm Beach · Boca Raton · Palm Beach (the Town) · Jupiter · Delray Beach · Boynton Beach · Palm Beach Gardens · Wellington · Lake Worth Beach · Unincorporated Palm Beach County · Riviera Beach and Singer Island · Royal Palm Beach · Greenacres · North Palm Beach · Highland Beach · Manalapan · Juno Beach · Lantana · Ocean Ridge · Palm Springs · Belle Glade
Every type, every size, all of Palm Beach County
Tell us the address and the scope. We will put a number on it.
Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A single wall or a whole building, each quote arrives as a written scope with a price.