Skip to content

Ocean Ridge, Palm Beach County

Demolition in Ocean Ridge

Before any demolition in Ocean Ridge, the Town holds a mandatory pre-construction meeting, and no work starts until that meeting is done, the permit has issued and the documents are posted on site. Hours, staging and debris get settled at that table on a barrier island served by A1A, so we bring the logistics plan to it.

The town incorporated in 1931 under the name Town of Boynton Beach and took the Ocean Ridge name in 1939. Jaega shell mounds near Boynton Inlet were leveled during the land boom.

Oceanfront redevelopment here follows the town’s own lines. A 2020 ordinance ties oceanfront floor-area calculations to the “1979 line,” the town has paused new projects while it rewrote its building rules, and it held a workshop on tightening teardown and debris rules. Hurricane Nicole flooded parts of town in November 2022.

The permits page asks for an Asbestos Notification Statement on every demolition, the Construction Site Management Handbook signature page on larger jobs, and contractor registration. From July 1, 2026, the universal county-wide application is required. Weekday work may start at 8 in the morning and must stop by 6 in the evening; on Saturday it ends at 1 in the afternoon.

Sources: Ocean Ridge, Florida (Wikipedia) · The Coastal Star: oceanfront homeowners and the 1979 line · The Coastal Star: Ocean Ridge new building rules · The Coastal Star: Ocean Ridge to tighten construction site rules · The Coastal Star: Hurricane Nicole along the coast

Demolition permits in Ocean Ridge

Town of Ocean Ridge Building Department

The permits page lists the mandatory pre-construction meeting, an Asbestos Notification Statement for demolition, a Notice of Commencement above the value threshold, the site management handbook page and the universal application from July 1, 2026. A Demolition Permit Checklist sits in the Document Center; ask the department for its current contents.

Read the official page

A general summary only, and not legal advice. When Romco takes the job, the application goes in under our name as contractor of record. Palm Beach demolition permit guide

What we quote in Ocean Ridge

Demolition we quote here

Order of work

From first call to closed permit

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A garden shed and an apartment building go through these steps in the same order.

  1. Call or send the form

    Give the address, what is coming down and anything that must be protected. Photos or a survey help.

  2. Walk the property

    We check the structure, live services, truck access, trees, the seawall or neighbor close by, and any association rules.

  3. Scope and price in writing

    Removal, protection, haul-off and anything that depends on the asbestos survey are listed line by line.

  4. Notices, letters and permit

    The licensed asbestos survey and any health department notice, the utility releases, then the application to the right building office.

  5. Take it down and haul it out

    Work runs in the agreed order. Loads go to Solid Waste Authority–permitted facilities, or the hauler your city requires.

  6. Final inspection and close-out

    The inspector signs off and the permit closes. You keep a graded lot or the shell you asked for.

Questions

Demolition in Ocean Ridge

What happens at the Ocean Ridge pre-construction meeting?

The Town requires the meeting before demolition starts, and no work may begin until it is held, the permit is issued and the documents are posted on the job site. The permits page does not publish an agenda, so ask the Building Department what to bring. We come with the schedule, staging and debris plan so questions are answered at the table.

What does a demolition cost, and what moves the number?

We do not publish prices, because the number depends on what surrounds the building. The main drivers are structure type and size, asbestos findings, truck access, the permit and utility requirements for the address, any below-grade work, and the haul to SWA-permitted facilities. Local rules move it too: the Town of Palm Beach requires a bond of the demolition cost plus 35%. Send the survey and photos, and we will price it.

Do I need an asbestos survey before demolition?

For commercial buildings, condos and co-ops, yes. The Florida Department of Health in Palm Beach County requires a survey and written notice at least 10 working days before a regulated demolition, even when no asbestos turns up. An isolated house of four or fewer units is usually excluded, though several cities still ask for an asbestos form with the permit. We arrange a licensed survey and coordinate licensed abatement.

How long does a demolition take?

We do not promise durations, because much of the calendar belongs to other parties. The health department’s asbestos notice needs 10 working days, Sunshine 811 needs two full business days, utility release letters arrive when the utilities issue them, and the Town of Palm Beach bars demolition from the Monday before Thanksgiving through March 31. We set out the sequence in writing with the quote, so you can see what drives it.

Other Palm Beach cities: West Palm Beach · Boca Raton · Palm Beach (the Town) · Jupiter · Delray Beach · Boynton Beach · Palm Beach Gardens · Wellington · Lake Worth Beach · Unincorporated Palm Beach County · Riviera Beach and Singer Island · Royal Palm Beach · Greenacres · North Palm Beach · Tequesta · Highland Beach · Manalapan · Juno Beach · Lantana · Palm Springs · Belle Glade

Every type, every size, all of Palm Beach County

Tell us the address and the scope. We will put a number on it.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A single wall or a whole building, each quote arrives as a written scope with a price.

Call (561) 273-9189Request a quote